Skip to content

Process analysis and requirements for GIS

Process analysis and requirements for GIS
CLIENT
Energy group (distribution)
CHALLENGE
The organization needed business requirements to support a tender for a Geographic Information System (GIS).
RESULT
We conducted as-is process mapping using the BPM Framework, designed target (to-be) processes, and developed requirements dosumentation for the Terms of Reference (ToR / tender specification)

Challenge

The distribution company within the energy group was preparing for the implementation of a Geographic Information System (GIS) and required the design of target business processes, as well as the development of detailed functional requirements for the tender specification. The key challenge was aligning system requirements with the organization’s actual operational processes.


Solution

We conducted a comprehensive mapping and analysis of as-is processes using the BPM Framework methodology. We designed target (to-be) processes and developed detailed functional requirements for the GIS system, directly derived from business processes and incorporated into the tender documentation.

  • As-in mapping: analysis of current processes using the BPM Framework methodology
  • To-be design: development of target business processes
  • Functional requirements: detailed specification for the GIS system
  • Tender documentation: preparation of requirements for public procurement

Using the BPM Framework, we carried out a detailed mapping of the organization’s operational processes, identifying key areas requiring system support. The designed target processes reflected both industry best practices and the specific characteristics of the distribution company. The developed functional requirements ensured a precise definition of expectations toward GIS system vendors.


Results

The distribution company received comprehensive process documentation along with functional requirements to support the GIS system tender.

01

The organization gained clearly defined target processes aligned with operational needs and industry regulatory requirements.

02

The prepared process and functional documentation enabled the efficient execution of the procurement process and the selection of the optimal GIS system vendor.

The designed processes provided a solid foundation for the subsequent implementation of the IT solution.